Boeing CEO: 737 Max production taking ‘a little bit longer’ to stabilize than expected سبتمبر 17, 2026, 8:57 ص by dev95 Posts Boeing CEO Kelly Ortberg said wing production at its Renton, Washington, factory is a hold up, adding the company has plans to address it.